NPI Program Management · Vietnam

Launch your product in Vietnam — without the guesswork

We guide US companies through every phase of new product introduction — from PLM setup and supplier sourcing to factory builds and production ramp — using our established Vietnam supply chain.

US-based engineering team
Vetted Vietnam factories
Mechanical, electrical & software
Metal, molding & assembly

What we do

End-to-end NPI services, built for Vietnam manufacturing

Most US companies trying to launch in Vietnam face the same wall: no supplier relationships, no PLM structure, and no one on the ground. We've already built what you need.

PLM setup & BOM management

Structure your product data from day one — BOMs, revisions, ECOs, and documentation in a system that scales with you.

Supplier sourcing & qualification

We identify, audit, and qualify factories for metal stamping, injection molding, silicone, and final assembly.

Contract manufacturer management

We negotiate contracts, define quality standards, and manage the CM relationship so you don't have to.

DFM & engineering review

Our mechanical, electrical, and software engineers review your design for manufacturability before tooling commits.

Prototype & pilot build management

We manage EVT, DVT, and PVT builds on the ground — resolving issues in real time, not across a 12-hour time gap.

Production ramp & handoff

We oversee first articles, yield ramp, and quality handoff so your product enters volume production with confidence.


How it works

From design files to production-ready parts

A structured NPI process with clear gates, so you always know where your program stands.

01

Discovery & DFM review

We review your design, identify manufacturability risks, and align on target cost, quality, and timeline before any commitments are made.

02

PLM structure & BOM setup

We configure your product data in a PLM system — part numbers, BOMs, supplier assignments, and revision control — so nothing falls through the cracks.

03

Supplier sourcing & factory selection

Using our established Vietnam supplier network, we identify the right factories for your specific processes and put contracts in place.

04

Prototype & engineering builds

We manage EVT and DVT builds with on-the-ground oversight — resolving issues, tracking defects, and feeding back into design revisions.

05

Pilot production & ramp

First articles, in-process quality checks, yield targets, and a clean production handoff — your program doesn't graduate until it's ready.


Why us

The bridge between your product team and Vietnam manufacturing

We're not a sourcing agent or a logistics broker. We're engineers who've built things in Vietnam, and we speak both languages.

US-based point of contact

Your program manager is in the same timezone, speaks your engineering language, and escalates issues in hours — not days.

Existing supplier relationships

We've already qualified metal stamping, injection molding, silicone, and CM partners in Vietnam. You skip years of relationship-building.

Full engineering depth

Mechanical, electrical, and software engineers on staff. We catch DFM issues before they become tooling costs.

Tariff-optimized supply chain

Vietnam's tariff position vs. China makes a compelling cost case. We help you structure programs that hold up as trade policy evolves.

Vietnam

Primary manufacturing base

3

Engineering disciplines

End-to-end

NPI program management


Our team

Engineers who've built things in Vietnam

We're not consultants parachuting into a new market. Our team has years of hands-on experience working with Vietnamese factories, suppliers, and contract manufacturers across mechanical, electrical, and software disciplines.

JD

Josh Davis

Founder & NPI Program Lead

15 years leading product launches from concept to volume production. Previously led all Engineering and Program Management tasks at a consumer electronics company responsible for millions of devices manufactured per year. Has personally managed Asia and VN-based supply chain and launched dozens of projects with manufacturing at Vietnam factories.

NPI strategyCM managementPLM
CA

Chrisopher Acera

Director Global Sourcing

With a Mechanical Engineering background, for over 30-years Chris is responsible for managing supplier relationships, factory audits, and on-the-ground build oversight.

Factory auditsSupplier QABuild oversight
BT

Brian Tong

Vietnam Operations Lead

Hanoi-based with a manufacturing engineer background focussed on quality, fluent in English, and Mandarin, Brian bridges the communication gap that sinks most NPI programs.

DFM reviewToolingInjection molding
AT

Anthony Triana

Electrical Lead

30 years in product development spanning PCB design, RF/Antenna design and test fixture development. Manages EVT/DVT electrical verification and ensures issues are identified early.

PCB designRFTest fixtures
SL

SY Lee

Manufacturing Engineer

30 years in product development spanning PCB design, RF/Antenna design and test fixture development. Manages EVT/DVT electrical verification and ensures issues are identified early.

PCB designRFTest fixtures
EP

Eric Paxton

Embedded Firmware Lead

10 years in product development spanning PCB design, RF/Antenna design and test fixture development. Manages EVT/DVT electrical verification and ensures issues are identified early.

PCB designRFTest fixtures

Example project

From Figma file to 5,000 units shipped

A US-based hardware startup came to us with a consumer IoT device, a tight 9-month timeline, and no Asia supply chain. Here's what we did.

Case study

Smart home environmental sensor — consumer IoT

A 3-part injection-molded enclosure with silicone gasket, custom PCB, BLE firmware, and retail packaging — manufactured and assembled in Vietnam.

Timeline9 months
Initial volume5,000 units
ProcessesInjection molding, SMT, assembly
LocationBinh Duong, Vietnam

18%

Under target BOM cost

2

DFM iterations before tooling

99.1%

First-pass yield at PVT

The challenge

Client had finished hardware design but zero Asia manufacturing experience. They needed a complete supply chain built from scratch — enclosure, PCB, firmware, packaging — and a CM that could scale to 50K units in year two.

What we delivered

  • PLM setup in Arena with full BOM and revision control
  • 3 qualified suppliers across molding, PCBA, and final assembly
  • DFM review that eliminated a $28K tooling redesign risk
  • Full EVT → DVT → PVT build management
  • On-site QA oversight at first production run

Build timeline

Month 1–2

DFM review & PLM setup

Reviewed design files, flagged 6 manufacturability issues, set up Arena PLM with complete BOM and supplier assignments.

Month 2–3

Supplier qualification

Audited 7 factories, selected 3 — injection molder in Binh Duong, PCBA house in HCMC, and final assembly CM with packaging capability.

Month 4–5

EVT build (Engineering Validation)

20-unit build to validate mechanical fit, electrical function, and firmware stability. 14 issues logged and resolved before DVT.

Month 6–7

DVT build (Design Validation)

100-unit build for regulatory testing and reliability validation. First articles approved. Packaging dielines finalized.

Month 8–9

PVT & production ramp

500-unit pilot run with in-process QA. 99.1% first-pass yield. Full 5,000-unit production order released on schedule.


Ready to launch in Vietnam?

Tell us about your product and timeline. We'll respond within one business day with an honest assessment of whether we're the right fit.

Start the conversation

Contact us

Tell us about your program

We respond within one business day. If we're not the right fit, we'll say so — and point you in the right direction.

The more detail you share, the more useful our response will be.

Message received

We'll review your program details and respond within one business day.